Home/ Engineering Hub/ Blast Freezing Calculator

Blast Freezing Calculator

Work out the freezing load for your product, see how long each batch really takes, and compare your current HFC cascade or LN₂ system against Karnot iCOOL CO₂ refrigeration and iCRYO air-cycle super-freezing — in pesos per year.

1. What You Freeze

Product frozen per working day
Chilled arrival 0–4 · warm process 10+
Hours available to freeze each day’s product

2. What You Run Today

Leaks + service gas — R404A prices are rising fast
For the yield / drip-loss line

3. Results

Refrigeration Load at Freezing Temperature
kW (includes 15% fans & losses)
Heat Removed per Day
Blast Air Temperature
Freeze Time vs -35°C Air
Est. Annual Benefit (incl. yield)

Yearly Running Cost Comparison

 TodayKarnot

Calculation Method

The same first-pass heat balance Karnot engineers use to size a blast freezer or super-freezing tunnel.

Results are for budgetary sizing. For a formal selection Karnot runs the full performance model at your design conditions — free for consulting engineers and contractors.

Built by Karnot Energy Solutions

Once you know the load, the next question is what serves it. Karnot supplies CO₂ refrigeration for standard blast freezing and air-cycle machines for -40°C to -110°C super-freezing — both on natural refrigerants, both immune to the HFC phase-down.

iCRYO — Air-Cycle Super-Freezing iCOOL — CO₂ Refrigeration Cold Room Load Estimator Cold Chain Solutions

Freezing product every day?

Send us your throughput and target temperature. Karnot runs the full freezing model at your design conditions and tells you honestly which technology fits — free for consulting engineers and processors.

Request a free freezing study See the iCRYO range