Boiler & Steam Load
Fuel & Tariff
Make-Up Flow
Pre-Heat Duty
Annual Heat Recovered
Recommended Karnot Solution
Annual Net Savings
Annual CO₂ Reduction
Estimated CAPEX
Simple Payback
10-Year Net Saving
Get a tailored boiler retrofit study
Our engineers will model your specific boiler, condensate return, fuel mix, and shift pattern — then quote turnkey iHEAT + iSTOR or an Energy-as-a-Service contract with zero CAPEX.
Request a Boiler StudyFrequently Asked Questions
Why pre-heat boiler feedwater?
Every 6°C rise in feedwater temperature cuts fuel consumption by approximately 1%. Lifting cold make-up water from 28°C to 85°C — a 57°C rise — cuts boiler fuel by roughly 9-10% on the make-up flow alone, and shaves 20-35% off total fuel where condensate return is low.
What is iHEAT R290?
iHEAT is Karnot’s industrial R290 (propane) heat pump platform — in full production today. R290 has a Global Warming Potential of just 3 (versus 2,088 for R410A) and delivers a COP of 3.0-3.5 producing hot water up to 75°C — perfect for boiler feedwater preheating into the deaerator. Single units run 9.5 to 50 kW, with parallel master/slave stacking up to 500 kW for larger boilers.
What is iSTOR?
iSTOR is Karnot’s stratified thermal battery — an insulated tank that stores hot water at 85-95°C produced by the iHEAT during off-peak hours and discharges it on demand to the boiler. It allows a smaller heat pump to serve a peaky steam load and lets you charge the tank from solar PV during daylight hours (Power-to-Heat).
Does this work for diesel, LPG, natural gas and HFO boilers?
Yes. The fuel offset is calculated on the basis of thermal energy displaced, then converted back to litres of diesel, kg of LPG, m³ of natural gas, or litres of HFO using each fuel’s net calorific value and typical boiler efficiency. The calculator handles all four.
What payback should I expect?
Payback is typically 2-4 years for diesel and HFO boilers in the Philippines, 3-5 years for LPG, and 4-7 years for natural gas (where available). The Karnot Energy-as-a-Service option removes CAPEX entirely — you simply pay a guaranteed-lower monthly fee.
Cut your boiler fuel bill by 5-10%
iHEAT R290 pre-heats your make-up water to 75°C. Reuse your existing feed tank, or add an iSTOR thermal battery. Zero-CAPEX EaaS available.